by GPR Data | Sep 9, 2020
Background: GPR Data was contacted by Graham Construction to help assess the condition of two bridges along Interstate 90. Graham (and WDOT) wanted to determine if the bridge needed a full removal, deck replacement, or concrete overlay rehabilitation. GPR Data’s...
by GPR Data | Sep 9, 2020
Background: The Alder Slope Cemetery was founded in 1870 and most of the known gravesites were marked with wooden crosses. When the historic cemetery was ravaged by a wildfire the historical society contacted GPR Data to help preserve the region’s history by mapping...
by GPR Data | Sep 9, 2020
Background: Seneca Resources was concerned that there may be voiding around an existing well head. The well needed to serviced, but if there was voiding it would be extremely dangerous to have the necessary heavy equipment in the area. GPR Data’s Solution: GPR Data...
by GPR Data | Sep 9, 2020
Background: The U.S. Army Corps of Engineers discovered some surface concrete issues with a levy and wanted to investigate the structural integrity within the concrete. They were concerned that some voiding may exist or potential rebar deterioration that could be...
by GPR Data | Sep 9, 2020
Background: Osprey Real Estate was making updates to a property with an existing CMU wall. They wanted to know if the existing CMU wall was constructed in way that would allow them to use it as a retaining wall for a few feet of fill soil. No plans or as-builts were...